Home› Industry-Specific Licensing› UAE Healthcare Clinic Licence: DHA, DOH and MOHAP Routes, Costs and Timeline
Industry-Specific Licensing

UAE Healthcare Clinic Licence: DHA, DOH and MOHAP Routes, Costs and Timeline

A clinic needs a facility licence from the health regulator and a trade licence for the company. Fit-out and clinician approvals usually set the timeline.

Free tool

See your setup cost

Get a realistic first-year cost estimate in seconds, free.

Try the Calculator
UAE Healthcare Clinic Licence: DHA, DOH and MOHAP Routes, Costs and Timeline
Key takeaways
  • Health licensing is split by emirate: DHA in Dubai, DOH in Abu Dhabi and MOHAP in the northern emirates.
  • A clinic needs a facility licence for the premises and a professional licence for each clinician, plus a trade licence.
  • In Dubai, advisers describe an inactive facility licence, then a medical director, NABIDH connectivity and an inspection before activation.
  • Reported costs include DHA facility fees of about AED 5,000 to AED 25,000 and fit-out from about AED 200,000 to over AED 2 million.
  • Advisers report six to eighteen months for a new clinic, and foreign ownership rules should be confirmed with the regulator.

A UAE clinic needs two separate approvals: a facility licence from the health regulator for the emirate, which is DHA in Dubai, DOH in Abu Dhabi and MOHAP in the northern emirates, and a trade licence for the company itself.

Government fees are the smaller cost. Advisers report that fit-out to regulator standards, a qualified medical director and the clinicians’ own licensing take most of the money and most of the six to eighteen months a new clinic typically needs.

Opening a clinic is not like opening a consultancy. The regulator controls the premises, the equipment, the staff and the medical records system, and it will not issue a facility licence until all of them are in place. This guide explains who regulates what, how the Dubai process works step by step, what the clinicians must do, what the budget looks like, and where founders usually lose months.

Detail What applies
Regulator, Dubai Dubai Health Authority (DHA)
Regulator, Abu Dhabi Department of Health (DOH)
Regulator, northern emirates Ministry of Health and Prevention (MOHAP)
Two licences A facility licence for the clinic and a professional licence for each clinician
Reported DHA facility licence fee About AED 5,000 to AED 25,000
Reported trade licence cost About AED 15,000 to AED 25,000
Reported fit-out About AED 200,000 to over AED 2 million, by size and specialty
Reported timeline Six to eighteen months for a new clinic

“A clinic licence is awarded to a finished clinic. Plan the fit-out as the first big cost, not the last.”

Who regulates what

Health licensing in the UAE is split by emirate. In Dubai the Dubai Health Authority licenses facilities and clinicians. In Abu Dhabi the Department of Health does it, and in the northern emirates the Ministry of Health and Prevention takes that role.

Each regulator has its own portal, forms, fees and standards, so a clinic that wants to operate in more than one emirate needs a licence from each. A trade licence from the economic department is also required, and the two sets of approvals have to match in activity and address.

The facility licence belongs to the clinic. The professional licence belongs to each doctor, dentist or nurse and is activated under the facility. Mixing them up is a common reason for stalled applications.

Our guide to professional versus commercial licences in the UAE explains how trade licence categories work, which is the company-side half of a clinic setup.

The Dubai process, step by step

Advisers describe the DHA route in a consistent order.

  1. Apply for a new facility licence. You submit proof of ownership, the facility proposal, the engineering layout and confirmation that the clinic will connect to Dubai’s electronic medical record standard, NABIDH. This produces an inactive licence, reported as valid for one year.
  2. Build and equip the premises to the regulator’s standards, with layouts for infection control, waste handling and patient flow.
  3. Appoint a medical director and licence the clinical staff.
  4. Confirm NABIDH connectivity so patient records can be shared in the approved system.
  5. Pass the DHA inspection. After a successful inspection the licence becomes active and the clinic can open.

The inactive-licence stage is useful because it lets you sign leases and order equipment with some confidence. It is not permission to treat patients, and operating before activation is a serious breach.

Stethoscope coiled on a wooden desk beside a blank clipboard
The regulator licenses a finished, inspected clinic, so fit-out comes before the final approval.

Abu Dhabi and the northern emirates

In Abu Dhabi, DOH usually grants a preliminary approval first and the permanent licence second. Advisers report about 20 working days for preliminary approval and about 25 for the licence once the requirements are met, although real timelines depend on how quickly the premises and the team are ready.

In the northern emirates, MOHAP follows its own procedure and fees. The principle is the same: approve the idea, build to standard, hire licensed staff, inspect and then activate.

Because the details differ, do not copy a Dubai budget into an Abu Dhabi plan. Ask the relevant regulator for its current checklist and fee schedule before you commit to a lease.

Licensing the clinicians

Every clinician needs a professional licence. In Dubai this runs through the DHA’s Sheryan portal and includes profile creation, document submission, primary source verification of qualifications and a computer-based Prometric exam in the clinician’s specialty.

Foreign-trained clinicians generally have to sit the exam themselves, and holding a licence in another Gulf country does not exempt them. Plan that into the hiring timeline, since a clinic cannot open without a licensed team.

Advisers report indicative costs: about AED 1,235 for primary source verification of a physician or dentist, about AED 935 for nurses and allied health staff, and an exam fee of roughly USD 180 to USD 300. Verification is reported at 15 to 45 working days in a standard case and up to 12 weeks if the issuing institution is slow.

Ownership and the medical director

Ownership rules for health facilities depend on the emirate, the facility type and the licensing zone. The sources we reviewed do not give a single answer on foreign ownership, so do not assume that a structure that works for a trading company will be accepted for a clinic.

Ask the regulator in writing who may own the facility, whether a local partner or sponsor is needed, and whether a licensed physician must hold a stake. Get the answer before you pay for a trade licence.

The medical director is a regulatory role as well as a staffing one. The regulator expects a qualified, licensed physician to be accountable for clinical standards, and the person has to be in place before the facility is activated. Hiring that person early also helps you design the clinic correctly.

Medical centre entrance glowing at dusk behind palm trees
Clinicians, the medical director and the premises all have to be approved before the facility goes live.

Health insurance and your patients

Many patients in the UAE are covered by employer or mandatory health insurance, which shapes how a clinic bills and which insurers it contracts with. Insurer contracts, tariff approvals and claims systems are a separate workstream and take time to arrange.

Our guide to mandatory health insurance across all emirates in 2026 explains the coverage rules that drive patient flow, which is useful when you build the clinic’s revenue forecast.

Plan the insurer contracting alongside the licence. A clinic that opens without any insurer agreements may find its early patients are mostly self-pay, which can make the first months slower than the business plan assumed.

What the budget looks like

Advisers report DHA facility licence fees of about AED 5,000 to AED 25,000, plus a healthcare trade licence of about AED 15,000 to AED 25,000, which puts government fees from about AED 20,000 upward. Those numbers are the visible part.

The large cost is the fit-out. Reports range from about AED 200,000 for a small outpatient space to more than AED 2 million for a larger or specialised clinic. Equipment, software, furniture and the first stock of consumables come on top.

One adviser puts first-year investment for a small general practice at about AED 323,000 to more than AED 2.5 million. Treat that as a planning range, not a quote, because specialty and location swing it heavily.

Our guide to other hidden costs in UAE company setup budgets lists other items that rarely appear in a first quote and are easy to forget in a clinic budget.

Insurance, data and ongoing compliance

Advisers report that clinics need professional liability insurance, with one source citing a minimum of AED 5 million per occurrence, and that they must take part in the mandatory health insurance schemes. Confirm the current figure with your regulator and insurer, since the requirement depends on specialty and facility type.

Our guide to UAE professional indemnity insurance explains how that cover works and what underwriters ask for.

Patient data brings its own duties. Health records are sensitive personal data, and a clinic has to handle consent, storage and access carefully. Our guide to UAE PDPL compliance in 2026 covers the personal data law that sits alongside the health regulator’s own rules.

Illustrative example

Consider a founder who signs a lease and starts a fit-out before the facility application is approved, then learns that the layout does not meet the regulator’s infection control standards. The contractor has to rebuild part of the space, the inspection slips by two months, and the clinic pays rent on an empty unit. Submitting the engineering layout for approval before the lease and the fit-out would have caught the problem on paper.

Not every health business needs a physical clinic. Telemedicine has its own rules and often builds on an existing licensed facility. Our guide to telemedicine licensing in the UAE explains why there is no separate licence and how the existing framework applies.

If you are considering a wellness, beauty or fitness venture instead, the approval layers are different, and a regulated medical service in a wellness setting can still trigger health regulator rules. Ask the regulator before you advertise any clinical service.

A realistic timeline

Advisers put the whole journey at six to eighteen months, and the range is wide because each stage can run in parallel or in sequence. A well-run project overlaps the work. A poorly run one does it one step at a time.

  • Months one to two: choose the specialty, the location and the regulator route; confirm ownership rules.
  • Months two to four: submit the facility application and layout; start clinician verification.
  • Months four to ten: fit-out, equipment, software and insurer contracting.
  • Final stage: activation steps, inspection and the first patient bookings.

The longest items are usually clinician verification and fit-out. Starting both early, and approving the layout on paper first, is the clearest way to shorten the plan.

Build a contingency into the budget and the timeline. An inspection that finds a layout problem costs weeks, and rent runs while you wait.

Common mistakes when licensing a clinic

  • Signing a lease and starting fit-out before the layout is approved.
  • Assuming the trade licence lets you treat patients.
  • Underestimating clinician licensing and the Prometric exam timeline.
  • Copying a Dubai budget into an Abu Dhabi or northern emirates plan.
  • Skipping medical liability insurance and patient data compliance until after opening.

When professional help is worth it

A clinic licence is one of the few company setups where specialist help usually pays for itself. A consultant familiar with the regulator can review the layout before you build, line up the trade licence and facility licence in the right order, and manage the clinician applications in parallel.

E.zone, which sets up trade licences for medical and wellness businesses, can handle the company side while your medical team handles the clinical side. Its guide to starting a medical clinic in Dubai in 2026 covers the same journey from the founder’s point of view.

This is general information and not legal or medical advice. Health licensing rules, fees and ownership requirements change, so confirm them with the regulator for your emirate before you commit capital.

Frequently asked questions

Who licenses clinics in the UAE?

The Dubai Health Authority in Dubai, the Department of Health in Abu Dhabi and the Ministry of Health and Prevention in the northern emirates.

What is the difference between a facility licence and a professional licence?

The facility licence belongs to the clinic. The professional licence belongs to each clinician and is activated under the facility.

Do doctors need to pass an exam?

In Dubai, foreign-trained clinicians generally sit a computer-based Prometric exam in their specialty, and holding a licence elsewhere in the Gulf does not exempt them.

How much does it cost to open a clinic in the UAE?

Advisers report DHA facility fees of about AED 5,000 to AED 25,000 and a trade licence of about AED 15,000 to AED 25,000, but fit-out is the largest cost, from about AED 200,000 upward.

How long does clinic licensing take?

Advisers report six to eighteen months for a new clinic, depending on fit-out and clinician verification.

Still deciding?

Talk to a setup advisor

Free 20-minute call to confirm the right structure for your business.

Book Free Consultation
AA

Amira Al Suwaidi

Business Setup Editor

Amira writes on UAE industry-specific licensing, helping founders navigate regulated sectors like healthcare, where regulator approvals decide the budget and the opening date.

Related Reading

Ready to set up? Get matched with the right structure.

e.zone advisors compare mainland, free zone and offshore for your specific business — free.

Get Free Consultation →
Scroll to Top